Skip to main content

Journal Category

Before and After Repair Stories

Short answer

6 articles in this category. Before and After, written from job files rather than from a keyword list.

This section of the OCRV Center journal holds 6 articles on before and after. Every piece is written by the estimators and technicians who did the work, and priced against our posted 2026 labor rates.

Updated 2026-07-29 by OCRV Center Editorial Team

These are job files, not testimonials. Real vehicles, real teardown findings, real hours and real calendars including the parts delays.

Before and After

  • Cabover Rebuild

    A eucalyptus limb came through the cabover bunk of a Class C. Roof, cabover structure, windshield surround and 19 working days of work.

    13 minute read

  • Ramp Door Tear Out

    A ramp door hinge tore out of the rear wall on a 34 foot toy hauler. What the hinge line looked like inside and what it took to rebuild.

    13 minute read

  • Buckled Frame Rails

    A jackknife on a wet on ramp buckled both frame rails ahead of the axles. What we measured, what we cut out, and why the A frame was fine.

    13 minute read

  • Sprinter Galley Rebuild

    A rear impact at 18 mph pushed the rear doors 4 inches into a camper galley. Body, cabinetry, plumbing and 12 volt, rebuilt in 27 days.

    13 minute read

  • Subfloor Rebuild

    Two seasons of a hardened slide bulb seal put water under the floor of a 36 foot fifth wheel. Teardown, 61 square feet of subfloor, real hours.

    13 minute read

  • Front Cap Section

    A 38 foot diesel pusher clipped a parking structure beam at 12 feet 4 inches. Teardown, sectional cap repair, hours and the calendar it took.

    12 minute read