Skip to main content

Repair Service

RV Interior Remodel for San Clemente Owners

Short answer

An RV remodel is a sequenced project, not a shopping list. Expect $1,500 to $50,000 and two to twelve weeks depending on how much layout actually moves.

An RV remodel at OCRV Center is a full interior renovation: cabinetry, countertops, flooring, furniture, wall and ceiling panels, lighting and layout changes. Projects run $1,500 for a single room refresh to $50,000 and up for a full-time-living conversion, and take two to twelve weeks in the shop.

Updated 2026-07-29 by OCRV Center Editorial Team

An RV remodel is a construction project inside a vehicle that flexes, twists and vibrates at 65 miles an hour. That single fact governs every decision in it. A quartz slab that would be fine in a house cracks in a coach because it was mounted rigid to a cabinet box that moves. A tile floor that looks right in the showroom grouts out in eight months for the same reason. Everything we build has to look right and it has to survive a road that never stops moving underneath it.

The second fact is that a remodel is a project, not a purchase. Owners usually arrive with a photo folder and a number in their head, and those two things rarely match. Our job at the front of it is to translate the folder into a scope with hours attached, tell you honestly where the money goes, and show you which decisions are cheap now and expensive later. Moving a wall is a different job than replacing what is on the wall, and the price difference is not subtle.

Interior renovations run $1,500 for a single room refresh to $50,000 and beyond for a full gut and rebuild, and custom build-outs reach $80,000 and up. Duration runs two weeks to twelve, occasionally longer when cabinetry is fully custom. All of it happens in our 35,000 square foot shop in Yorba Linda, about 45 minutes from San Clemente up the I-5 or the 73. Plan on the coach living here for the duration of the build.

How We Scope a Remodel Before Anyone Removes a Cabinet

The scope conversation is the most valuable hour of the project and it happens with the coach in front of us, not over email. We walk it with you and sort every item you want into three buckets: cosmetic, structural and mechanical. Replacing a dinette cushion set is cosmetic. Removing the dinette and building a desk is structural, because the dinette base is usually anchored to the floor and often hides plumbing or a heat duct. Moving a sink is mechanical, because it moves supply, drain and vent. Owners are routinely surprised by which of their wish list items lands in which bucket.

Then we take the coach apart on paper. Where do the water lines run. Where is the heat duct. Which walls carry roof load and which are just partitions. Where does the slide travel and what clearance does it need at full extension. Those answers set the boundary of what is possible before we discuss finishes at all. A galley island that looks perfect in a rendering is not possible if it sits in the slide path, and you want to know that on day one, not on day thirty.

You get a written scope with the work broken into phases, hours per phase, materials specified by product and a price per phase. That structure lets you cut before you start rather than mid-project, which is where remodels go badly wrong. If the full plan comes back at $34,000 and your number is $22,000, we will show you which phases to defer and what deferring them costs you when you come back for them in two years.

Cosmetic, structural, mechanical
Every wish list item gets sorted. Cosmetic is surface only. Structural touches anchored components or load paths. Mechanical moves plumbing, electrical or ducting. The bucket determines the hours, not the finish.
Hidden routing survey
We map water lines, drains, heat ducts, 12V runs and 120V circuits before the plan is locked. Half of what limits a layout is behind a panel you have never seen.
Slide path clearance
Anything you build has to clear the slides at full extension and full retraction. This single constraint kills more island and sofa plans than budget ever does.
Weight and balance check
Solid surface, tile and hardwood add real weight. We check the addition against axle ratings and cargo carrying capacity before specifying, because an overweight coach is an unsafe coach.
Phased written scope
Work is priced by phase with hours and materials specified, so you can defer a phase before the project starts rather than stopping halfway through with the floor open.

The Three Budget Tiers Most Remodels Fall Into

Refresh tier runs roughly $1,500 to $8,000. Nothing structural moves. This is flooring, paint or wall treatment, new countertops on the existing cabinet boxes, new hardware, updated lighting and often a furniture swap. It is the highest return per dollar in the whole category, because you are changing everything the eye lands on without touching anything the eye does not. A refresh on a 2015 Class A takes ten to twenty working days and makes it read like a coach ten years newer.

Renovation tier runs roughly $8,000 to $35,000. Cabinet boxes come out or get rebuilt, layouts change within existing walls, plumbing fixtures move short distances, the dinette becomes something else, and the whole interior gets a new material palette. This is where most serious remodels land. Expect four to eight weeks and expect a real design phase before anyone touches the coach, because at this level decisions interlock. Changing a countertop material changes the cabinet build, which changes the electrical rough-in behind it.

Full gut and custom build-out runs $35,000 to $80,000 and up. Walls move, the layout is redrawn, everything gets replaced down to the subfloor, and often the electrical and plumbing systems are rebuilt with it. Full-time living conversions and vintage restorations live in this tier. These are eight to twenty week projects with a design phase in front, and they only make financial sense on a coach whose chassis and structure are worth building on. We will tell you plainly if yours is not.

Refresh, $1,500 to $8,000
Flooring, countertops on existing boxes, hardware, lighting, wall treatment and furniture. Nothing anchored moves. Ten to twenty working days and the best return per dollar in the category.
Renovation, $8,000 to $35,000
Cabinet boxes rebuilt or replaced, layout changes inside existing walls, short plumbing moves, full material palette change. Four to eight weeks with a design phase in front of it.
Full build-out, $35,000 and up
Walls move, subfloor comes up, electrical and plumbing get rebuilt. Full-time conversions and vintage restorations. Eight to twenty weeks and only worth doing on a sound structure.
Where the money actually goes
Labor is usually 60 to 70 percent of a remodel and materials are the smaller half. That is why deferring a phase saves less than owners expect once the coach is already open.
Contingency
Budget 10 to 15 percent above the quoted scope. Opening a floor or a wall on a coach older than fifteen years usually reveals something, most often soft subfloor at a slide opening.

Why the Order of Operations Decides Your Timeline

A remodel done in the wrong order costs more than the same remodel done twice at a smaller scale. The sequence is rough-in, then substrate, then finish, then trim, then furniture, and each stage gets inspected before the next one buries it. Electrical and plumbing rough-in goes in while walls are open. Subfloor repair happens before flooring. Cabinet boxes get set and leveled before countertops are templated, because a template taken from an unlevel box produces a countertop that never fits.

Countertops are the most common scheduling bottleneck. Solid surface and quartz get templated after the boxes are installed, then fabricated off site, and that fabrication window runs one to three weeks during which we work around an unfinished galley. We plan for it. What we cannot plan around is a customer selection made late, which is why we push hard for every material choice to be locked before demolition starts. A single undecided backsplash can hold a $30,000 project for two weeks.

Flooring goes down after wet work is finished and before furniture is set, and it runs continuously under slide rooms with the slides retracted so the visible seam falls where the slide covers it. Wall and ceiling panels go up before crown and trim. Lighting gets rough-wired at the panel stage and fixtures land near the end. Furniture and upholstery are last, because everything before them generates dust you do not want in new fabric.

Rough-in before close-up
Electrical, plumbing and duct changes happen while walls and floors are open, inspected and photographed before anything covers them. Reopening a finished wall costs three times what it cost the first time.
Subfloor first
Any soft subfloor, especially at slide openings and under the shower pan, gets repaired before flooring goes down. Laying new floor over compromised decking guarantees a redo.
Countertop template window
Solid surface and quartz get templated after cabinet boxes are set and level, then fabricated off site over one to three weeks. This is the most common schedule bottleneck in a remodel.
Selections locked before demolition
Every material, color, hardware finish and fixture gets chosen and confirmed before the first cabinet comes out. Late selections stall projects far more often than parts do.
Soft goods last
Furniture, upholstery, window treatments and mattresses go in after all dust-generating work is complete, which is why the interior looks unfinished until the final week of the build.

Layout Changes: Dinettes, Bunk Rooms and Full-Time Conversions

The most requested layout change of the last few years is the dinette. Factory booth dinettes are uncomfortable, waste floor area and rarely sleep anybody well. Converting one to a desk and cabinet run, to theater seating, or to a pair of recliners with a table between them changes how the coach lives more than any other single move. The complication is what the dinette base was hiding, which is commonly a heat duct, a water line run, a 12V junction or an inverter, and every one of those has to be rerouted properly rather than tucked somewhere out of sight.

Bunk room conversions run a close second. Kids grow up, and a quad bunk room becomes wasted square footage. That space converts well into an office with a desk and full-height storage, a gear garage with a tie-down floor, or a proper primary bedroom on smaller coaches. On a fifth wheel the bunk room often sits over the pin box, which means anything heavy going in there needs a weight check against the hitch rating before we build it.

Full-time living conversions are their own category. Two people living in a coach year round need real pantry volume, a workstation that does not fold away, laundry, better insulation, upgraded electrical capacity for actual appliances, and storage designed for possessions rather than camping gear. Those projects run $35,000 to $80,000 and up and take eight to twenty weeks. They also require a hard conversation about whether the chassis under the coach is worth the investment, and we will have it with you honestly.

Dinette conversions
Booth to desk, theater seating or recliners. The base almost always conceals ducting, plumbing or a 12V junction that has to be rerouted properly rather than relocated by feel.
Bunk room conversions
Quad bunks become an office, a gear garage or a primary bedroom. On a fifth wheel the bunk room often sits over the pin box, so heavy additions need a hitch weight check first.
Full-time living build-outs
Pantry volume, a fixed workstation, laundry, added insulation and upgraded electrical capacity. Eight to twenty weeks and $35,000 to $80,000 and up depending on how much layout moves.
Storage engineering
Drawers and pull-outs in a moving vehicle need soft-close hardware rated for road load and positive latching. Standard residential slides fail within a season of real travel.

Cabinetry, Countertops and Flooring in a Vehicle That Moves

Cabinetry work splits three ways and the prices are very different. Refacing keeps the existing boxes and replaces doors, drawer fronts and hardware, which runs $500 to $2,500 on most coaches and takes three to eight days. Rebuilding boxes with new faces and interiors lands mid-range. Fully custom cabinetry built to a drawing runs to $7,500 and beyond and takes weeks, because every piece is fabricated for one coach. Refacing gets most owners eighty percent of the visual change for a quarter of the cost, and we say so before you spend the rest.

Countertops in a coach have to tolerate flex. Solid surface handles it well because it can be seamed and repaired in place. Quartz and granite are attractive and heavy, and they need a properly supported and isolated substrate so the slab never carries a twisting load from the cabinet box. Butcher block moves with humidity and needs sealing on all six sides including the underside, which is the side everybody forgets. Laminate is genuinely fine and costs a fraction of the rest.

Flooring is where LVT has taken over for good reason. It handles flex, it handles moisture, it is quiet underfoot, and it can run continuously under slide rooms so the joint disappears when the slide is out. Real tile grouts out in an RV within a couple of seasons unless it is set in a flexible system, and we generally talk owners out of it. Flooring replacement runs $750 to $9,500 at six to forty hours depending on square footage and how much subfloor repair surfaces once the old floor comes up.

Refacing versus rebuilding
Refacing keeps sound boxes and replaces doors, fronts and hardware at $500 to $2,500. Custom fabrication reaches $7,500 and up. Most owners get the look they want from refacing.
Countertop material tradeoffs
Solid surface seams and repairs in place. Quartz and granite need isolated support so the slab never carries a twisting load. Laminate is light, inexpensive and genuinely durable in a coach.
LVT under slide rooms
Luxury vinyl tile runs continuously under slide rooms with the slides retracted, so the joint sits where the slide covers it. It handles flex and moisture better than any alternative.
Subfloor discovery
Once old flooring comes up, soft decking at slide openings and under showers is common on coaches over ten years old. Budget contingency for it rather than hoping against it.
Wall and ceiling panels
Headliner and wall panel replacement runs $500 to $5,500 at three to twenty two hours. Vinyl-faced luan, shiplap and painted panel all behave differently over a flexing structure.
Line itemRangeHours
Shower, tub and pan replacement$750 to $5,5004 to 25
Faucet and fixture replacement$200 to $800

Ranges reflect real jobs we have run. Final figures come from a written estimate after we see the vehicle.

Vintage Restoration and What Project Duration Really Looks Like

Vintage restoration is a different discipline from remodeling. On an Airstream, a vintage Avion or a 1970s Class A, the goal is usually a coach that reads period-correct but functions like a modern one. That means the shell, the frame and the skin get addressed before the interior, because there is no point building a beautiful galley into a trailer with a rotted floor rail. We take a vintage project in structure-first order every time, and we will not skip that step for a customer who only wants the inside done.

The honest duration numbers look like this. A refresh is ten to twenty working days. A renovation inside existing walls is four to eight weeks. A full gut or custom build-out is eight to twenty weeks. A vintage restoration with structural work in front of it is three to nine months. Those ranges assume decisions get made promptly and materials are in stock, and both of those things are partly on you. Late selections are the single largest cause of overrun on remodel projects.

Deposit terms follow the same schedule as any job here. 50 percent at authorization on anything over $2,000, an additional 25 percent when parts and materials arrive on anything over $10,000, and the balance at pickup before the coach leaves the property. Special order materials, which on a remodel means most cabinetry hardware and any custom slab, require a 100 percent non-refundable deposit at order. That is standard for made-to-order goods and we flag exactly which line items it applies to before you sign.

Structure before interior
On a vintage coach the frame, floor rails and skin get addressed before any interior work. Building a new galley over a rotted floor rail wastes the entire interior budget.
Period-correct with modern systems
Original-look cabinetry and finishes over rebuilt 12V, 120V, LP and plumbing systems. The coach reads like 1972 and functions like this year, which is what owners actually want.
Duration by tier
Refresh ten to twenty working days. Renovation four to eight weeks. Full build-out eight to twenty weeks. Vintage restoration with structural work in front, three to nine months.
Deposits and special orders
50 percent at authorization over $2,000, another 25 percent when materials land on jobs over $10,000, balance at pickup. Custom slabs and made-to-order hardware need full deposit at order.

What This Costs at Our Posted Rates

Body and paint labor is posted at $210 per hour. Mechanical and electrical is $260 per hour. Diagnostics run $285 per hour with a one hour minimum that is credited back against an authorized repair. Ranges below reflect jobs we have actually completed.

Typical range
Line itemRangeHours
Full interior remodel, cabinets, countertops, flooring and walls$1,500 to $50,000+20 to 250
Interior renovation and remodel$1,500 to $35,000+15 to 150
Furniture replacement, theater seats, sofas and dinettes$750 to $8,5004 to 25
Cabinetry repair, refacing and custom build$500 to $7,5004 to 35
Flooring replacement, LVT, vinyl, carpet or tile$750 to $9,5006 to 40
Headliner and wall panel repair and replacement$500 to $5,5003 to 22
Custom build-outFull-time living conversions and vintage restorations.$5,000 to $80,000+40 to 400

Ranges reflect real jobs we have run. Final figures come from a written estimate after we see the vehicle.

See the full rate card and estimate policy.

Our Process and What It Takes

  1. Scope walk with the coach here

    We go through the coach with you, sort the wish list into cosmetic, structural and mechanical, and identify what is routed behind the panels you want to change.

    Day 1, 1 to 2 hours

  2. Design and material selections

    Layout drawings where the plan moves anything anchored, plus every material, color, hardware finish and fixture chosen and confirmed in writing.

    Week 1 to week 3

  3. Phased scope and authorization

    A written scope priced by phase with hours and products listed. You approve phase by phase. Deposit collected on any job over $2,000 before materials are ordered.

    Week 2 to week 4

  4. Demolition and rough-in

    Old finishes out, subfloor inspected and repaired, electrical, plumbing and duct changes roughed in and photographed before anything gets covered.

    Build week 1 to week 3

  5. Cabinetry, surfaces and finish

    Boxes set and leveled, countertops templated and fabricated, flooring laid under retracted slides, wall and ceiling panels, trim and lighting.

    Build week 2 to week 10

  6. Furniture, final fit and walkthrough

    Seating, upholstery and window treatments installed last, then every drawer, latch, slide and fixture is checked and demonstrated with you at pickup.

    Final 1 to 2 weeks

What Is Included

  • Scope walk with the coach present, every wish list item sorted cosmetic, structural or mechanical
  • Routing survey of water lines, drains, ducting and 12V and 120V circuits before design is locked
  • Slide path and clearance verification against every proposed layout change
  • Weight check against axle ratings and cargo carrying capacity before materials are specified
  • Phased written scope with hours, materials specified by product and a price per phase
  • Rough-in of electrical, plumbing and ducting inspected and photographed before it is covered
  • Subfloor inspection and repair at slide openings and wet areas before flooring is laid
  • Cabinet box setting and leveling before any countertop is templated
  • Countertop templating, fabrication coordination and installation on isolated support
  • Final fit and function check on every drawer, latch, slide and fixture, plus a pickup walkthrough

Questions We Get Asked

What does a full RV interior remodel cost?

Interior renovation runs $1,500 to $35,000 and up at fifteen to one hundred fifty hours. A full remodel covering cabinets, countertops, flooring and walls runs $1,500 to $50,000 and up at twenty to two hundred fifty hours. Custom build-outs reach $80,000 and beyond. The spread is driven almost entirely by whether anything anchored moves. Surface work is cheap. Moving plumbing, ducting and walls is not.

How long will my RV be in the shop for a remodel?

Ten to twenty working days for a refresh. Four to eight weeks for a renovation inside existing walls. Eight to twenty weeks for a full gut or custom build-out. Three to nine months for a vintage restoration with structural work in front of it. Those ranges assume selections are locked before demolition. Late material decisions are the largest single cause of overrun.

Can you move a wall or change the floor plan?

Sometimes, and it depends entirely on what the wall is doing. Partition walls that carry no roof load and no slide mechanism can usually come out or move. Walls carrying structure, slide rails or the run of a main duct are a much bigger job. We map all of that during the scope walk before anything is promised, because the answer changes which budget tier you are in.

Will a remodel add weight I need to worry about?

Yes, and it matters more than most owners expect. Quartz, granite, tile and hardwood add real weight in places a coach was not designed to carry it. We check every proposed material package against axle ratings and cargo carrying capacity before specifying, and we suggest lighter alternatives when a selection pushes you over. An overweight coach handles badly, wears tires unevenly and is a genuine safety problem.

Can an insurance claim pay for interior work?

Only when the interior damage came from a covered loss, such as water intrusion after a collision, a fire, or a slide failure that damaged cabinetry and flooring. Elective remodeling is customer pay. If your interior work does stem from a claim, we can write the interior scope as part of the claim documentation and bill the carrier directly for that portion.

Do you remodel camper vans and build out work trucks?

Yes. Camper van conversions on Sprinter, Transit and ProMaster chassis and work truck interior build-outs run through the same scoping and sequencing process. Custom build-out pricing is $5,000 to $80,000 and up at forty to four hundred hours. Van builds add electrical system design and insulation work that a motorhome remodel usually does not require.